GeoPoint was selected as the primary provider of survey services for this project. GeoPoint’s responsibilities included a pre-construction topographic survey completed using our UAV mounted RIEGLl VUX1-LR LiDAR scanner, post height calculations, mapping, and staking for approximately 48000 solar panel support posts. GeoPoint also provided tracker assembly and cable tray layout as well as power converter system locations, meteorological towers and power pole locations for this 75 megawatt solar project covering approximately 550 acres in southeast Hillsborough County.